A.operated by one winchman
B.cradled on deck
C.swung from one hatch to the adjacent hatch
D.collared to the mast
您可能感興趣的試卷
你可能感興趣的試題
A.The boat should be hoisted a few inches clear of the cradle before cranking out the davits
B.The inboard gripes should be cast off before the outboard gripes
C.The outboard section of the cradle must be released
D.The tricing pendants will automatically bring the boat alongside at the embarkation deck
A.decks
B.cabins
C.holds
D.positions
A.gross tonnage
B.deadweight space
C.bale cubic
D.stowage area
A.amount of chain lying along the bottom increases
B.length of the catenary is reduced
C.mooring line tension is increased
D.amount of chain lying along the bottom decreases
A.crane pedestal
B.wire-rope locker
C.main deck
D.crane controls
最新試題
The tweendecker has()below the main deck.
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
Which mooring line prevents sideways motion of a vessel moored to a pier().
The Chief Petty Officer employed in the repair and maintenance work shall such abilities as to prepare and apply().
The minimum length of a boat painter for a lifeboat in ocean service is().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
Which will cause a wire rope to fail().
When lowering lifeboats in heavy seas,a good practice is to rig frapping lines().
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
The main advantage and chief characteristic of a Steulchen boom is that it can be().