A.inspect
B.impairs
C.impacts
D.insects
您可能感興趣的試卷
你可能感興趣的試題
A.commence
B.generate
C.give
D.have
A.liable for any repair
B.liable for any failure
C.responsible for any repair
D.responsible for any fulfilling
A.to their final position with the winch operating at slow speed
B.to the bar stop,and then hand cranked to their final position
C.until just before they make contact with the limit switch,and then hand cranked to their final position
D.to the embarkation deck,and then hand cranked to their final position
A.coiled
B.faked
C.flemished
D.seized
A.Personnel may work beneath suspended loads,as long as they are alert and wear hard hats
B.If a suspended load with no tag begins to spin,personnel should attempt to stop the spinning if the load is within reach
C.If tag lines are used to control a suspended load,they should be secured to the deck
D.Personnel not involved in the hoisting operation should be kept clear of the transfer area
最新試題
Fueling activities()waste liquids and vapor releases to air.
What term indicates the line drawn at the top of the flat plate keel().
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
Which type of link is generally used to connect shots of anchor chain().
The margin plate is the().
The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()
You are handling a mooring line and are instructed to Check the line.What should you do().
What is TRUE about hoisting operations?()
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().