A.another deck
B.two other decks
C.no deck
D.additional deck
您可能感興趣的試卷
你可能感興趣的試題
A.crew's quarters
B.engine room
C.main deck
D.tank top
A.loosely
B.closely
C.heavily
D.strongly
A.spotting a boom
B.collaring a boom
C.cradling a boom
D.toppling a boom
A.60 fathoms
B.the distance from the main deck to the light waterline
C.twice the distance from the main deck to the light waterline or 50 feet whichever is greater
D.two times the distance from the boat deck to the light waterline or 50 feet whichever is greater
A.outboard strake of plating on each side of an innerbottom
B.outer strake of plating on each side of the main deck of a vessel
C.plate which sits atop the center vertical keel
D.uppermost continuous strake of plating on the shell of a vessel
最新試題
The terms ceiling and margin plate are associated with the().
The main advantage and chief characteristic of a Steulchen boom is that it can be().
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().
The minimum length of a boat painter for a lifeboat in ocean service is().
The process of lowering a boom to a horizontal position and onto its deck support is called().
What is meant by the term TOPPING THE BOOM?()
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
The margin plate is the().