A.decks
B.cabins
C.holds
D.positions
您可能感興趣的試卷
你可能感興趣的試題
A.gross tonnage
B.deadweight space
C.bale cubic
D.stowage area
A.amount of chain lying along the bottom increases
B.length of the catenary is reduced
C.mooring line tension is increased
D.amount of chain lying along the bottom decreases
A.crane pedestal
B.wire-rope locker
C.main deck
D.crane controls
A.to
B.in
C.on
D.with
A.deck edge immersion
B.the load line
C.downflooding
D.loll
最新試題
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The terms ceiling and margin plate are associated with the().
The purpose of the tripping line on a sea anchor is to().
Which tackle arrangement has the LEAST mechanical advantage().
You have been towing astern and have just let go the tow.Your deckhands are pulling in and faking the towline by hand on the stern.The most dangerous action to take is to().
The margin plate is the().
The minimum length of a boat painter for a lifeboat in ocean service is().
What term indicates the line drawn at the top of the flat plate keel().
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
The process of lowering a boom to a horizontal position and onto its deck support is called().