A.only when the cargo is within its rail
B.during the time when loading or unloading is going on
C.after the cargo is checked by tallymen
D.as soon as loading or discharging begins
您可能感興趣的試卷
你可能感興趣的試題
A.advance freight
B.back freight
C.dead freight
D.pro rata freight
A.Guy failures
B.Topping lift failures
C.Bending of the boom from compression
D.Gooseneck failure
A.is capable of bringing
B.is sufficient to bring
C.is not capable of bringing
D.is probally to bring
A.ships arrive at random
B.cargo-handling time varies greatly
C.ships have to queue to get onto berths
D.ships do not have to wait to get onto berths
A.breakdown
B.breaked down
C.broken down
D.broke down
最新試題
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
Please tell your tallymen to()out the marks in the holds during discharging.
When general cargo with different amounts in each draft is involved,the checker must use the ().
What type of liquid is used in the liquid P/V breaker().
Which cargo is considered volatile().
We’ll adopt the mechanical tallying method().
Due to the shape of the(),whereby forward- and aft ship are differently shaped,a trim correction on the draft measurement has to be done.
The foreman says that the stevedores stopped working owing to the()of the winch.
Please don’t change the cargo plan()will.
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().