A.Guy failures
B.Topping lift failures
C.Bending of the boom from compression
D.Gooseneck failure
您可能感興趣的試卷
你可能感興趣的試題
A.is capable of bringing
B.is sufficient to bring
C.is not capable of bringing
D.is probally to bring
A.ships arrive at random
B.cargo-handling time varies greatly
C.ships have to queue to get onto berths
D.ships do not have to wait to get onto berths
A.breakdown
B.breaked down
C.broken down
D.broke down
A.decelerating when lowering the load
B.decelerating when raising the load
C.lowering the load at constant speed
D.raising the load at constant speed
A.at
B.on
C.about
D.after
最新試題
The full utilization of berths can be achieved if().
When general cargo with different amounts in each draft is involved,the checker must use the ().
What is the minimum standard for making an eye splice in a wire to be used as cargo gear().
The Captain of the Port has closed to navigation,and buoyed,a section of a harbor. These buoys would be painted().
The Tally Fees will be settled()my Shipowner()the agents.
Preventer bars are fitted on lifeboat releasing hooks to prevent().
The foreman says that the stevedores stopped working owing to the()of the winch.
Which statement is TRUE concerning the gooseneck().
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
What type of liquid is used in the liquid P/V breaker().