A.Bunker C
B.Turkey-red oil
C.Sweet oil
D.Iso-Propylamine
您可能感興趣的試卷
你可能感興趣的試題
A.Contain the oil and remove as much of it as possible from the water
B.Throw chemical agents on the water to disperse the oil
C.Throw sand on the water to sink the oil
D.Obtain your permit from the Corps of Engineers
A.unit method
B.block method
C.straight method
D.package method
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
最新試題
When oil is accidentally discharged into the water,what should you do after reporting the discharge().
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().
We’ll adopt the mechanical tallying method().
The man directing and supervising the work of stevedores is the().
Red lights may appear on().
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
While you are working in a space,the fixed CO2 system is accidentally activated.You should().
Preventer bars are fitted on lifeboat releasing hooks to prevent().
The Tally Fees will be settled()my Shipowner()the agents.
Please shift some light cargo to fill it().