A.unit method
B.block method
C.straight method
D.package method
您可能感興趣的試卷
你可能感興趣的試題
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
最新試題
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
The stevedores have already stowed the porcelain ware()up to the deckhead.
The foreman says that the stevedores stopped working owing to the()of the winch.
The inability to supply a cargo of the contractual quantity in the country of shipment()the doctrine of frustration into operation.
The full utilization of berths can be achieved if().
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
Which cargo is considered volatile().
While you are working in a space,the fixed CO2 system is accidentally activated.You should().
You are transporting dangerous cargo on your vessel.You must inspect this cargo().
Red lights may appear on().