A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
您可能感興趣的試卷
你可能感興趣的試題
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
A.unit method
B.block method
C.straight method
D.package method
最新試題
The foreman says that the stevedores stopped working owing to the()of the winch.
The Tally Fees will be settled()my Shipowner()the agents.
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
Red lights may appear on().
When general cargo with different amounts in each draft is involved,the checker must use the ().
Due to the shape of the(),whereby forward- and aft ship are differently shaped,a trim correction on the draft measurement has to be done.
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
()is not an advice be observed when samples are taken in tanks containing volatile petroleum products.
The man directing and supervising the work of stevedores is the().
The cargo,when(),should be completely covered with plastic.