A.he must procure a cargo and bring it alongside the vessel
B.he must load a full and complete cargo
C.he must load in the time stipulated
D.he must have the vessel tightly secured to the quay where the loading is to take place
您可能感興趣的試卷
你可能感興趣的試題
A.to
B.by
C.in
D.of
A.himself
B.the owner
C.him
D.the shipper
A.occurs
B.incurs
C.discus
D.recurs
A.the Shipowner
B.the shipper
C.the Charterer
D.the carrier
A.rescind
B.change
C.alter
D.amend
最新試題
The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().
The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.
The master’s authority to act in the interests of the cargo owner is part of his general authorityas servant of the Shipowner,and therefore()will be liable if the master abuses his powers.
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
In modern times,the work of stowage is generally deputed to stevedores,but that does not generally relieve the shipowners()their duties even though the stevedores are,under the charter-party,to be appointed by the Charterers.
The cesser clause mainly purports to relieve()from paying demurrage.
If the Shipowner has failed to carry out a term of a time charter-party whereby he undertakes to maintain the vessel in a seaworthy state,this only()the Charterer to sue him for damages,and not to repudiate the charter-party.
It is not the Charterer’s duty that().
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
If the vessel does not arrive by the canceling date,and the Charterer()expenses,these expenses can be claimed by him from the Shipowner where they are in the reasonable contemplation of the parties.