單項(xiàng)選擇題If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.

A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred


您可能感興趣的試卷

最新試題

A charter-party usually contains a clause stating that the master is to be under the orders of the()as regards employment,agency or other arrangements.

題型:單項(xiàng)選擇題

The object of the both-to-blame collision clause is().

題型:單項(xiàng)選擇題

Delivery of a vessel to a charterer is called().

題型:單項(xiàng)選擇題

Freight rates are mostly charged().

題型:單項(xiàng)選擇題

Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.

題型:單項(xiàng)選擇題

Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.

題型:單項(xiàng)選擇題

If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.

題型:單項(xiàng)選擇題

()is not within the exception of the perils of the sea.

題型:單項(xiàng)選擇題

If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.

題型:單項(xiàng)選擇題

()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.

題型:單項(xiàng)選擇題