單項(xiàng)選擇題In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().

A.increase fatigue life of the system
B.reduce the time to retrieve the line
C.increase the holding power
D.reduce the catenary


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題Galvanizing would not be suitable for protecting wire rope which is used for().

A.cargo runners
B.mooring wires
C.shrouds
D.stays

2.單項(xiàng)選擇題During a storm,the chance of fatigue failure of a mooring line will increase as().

A.vessel motions increase
B.mooring tensions decrease
C.KG increases
D.KG decreases

4.單項(xiàng)選擇題Chafing gear should be placed().

A.at all wearing points of mooring lines
B.at the bitter ends of all standing rigging
C.around running rigging
D.on wire rope only

5.單項(xiàng)選擇題By paying out more anchor cable,you().

A.decrease the holding power of your anchor
B.decrease the swing of your vessel while at anchor
C.increase the holding power of your anchor
D.increase the possibility that your vessel will drag anchor