A.Hull
B.Cargo
C.Protection and Indemnity
D.Pollution
您可能感興趣的試卷
你可能感興趣的試題
A.Visible damage to the towline,including fishhooks
B.Measurements showing a decrease in diameter
C.A surface condition of corrosion and discoloration
D.All of the above
A.contract policy
B.insurance policy
C.time policy
D.voyage policy
A.if the freight and insurance premium are paid,they shall be added to the basis
B.if the freight and insurance premium are not paid,they shall be added to the basis
C.the freight and insurance premium shall not be added to the basis even they are paid
D.the freight and insurance premium shall be added to the basis even they are not paid
A.cost
B.compensation
C.value
D.price
A.maximum possible area
B.minimum possible area
C.nearest watertight door
D.nearest longitudinal girder
最新試題
The premium is usually included in().
Ordinarily the transit()when the goods leaves the seller’s possession,and ends when they get into the possession of the buyer.
The BEST information on the nature and extent of damage to the vessel is obtained from().
The safety of the port should()in respect of a vessel properly manned and equipped,and navigated and handled without negligence and in accordance with good seamanship.
The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to().
Which factor(s) might indicate that a towline should be removed from service? ()
The shipper is deemed to have guaranteed the accuracy at the time of shipment of the quantity and weight as furnished by him,and must indemnify()against all losses,damages and expenses arising from the inaccuracies in such particulars。
Repairing damage to the hull of a ship at or above the waterline reduces the threat of().
The person entitled to make a claim for the loss of goods may()them as lost if they have not been delivered within 60 consecutive days following the expiry of the time for delivery.
When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ().