A.total and partial loss
B.4/4 collision liability
C.general average
D.all of the above
您可能感興趣的試卷
你可能感興趣的試題
A.unsafe
B.safe
C.good
D.bad
A.constructive total loss
B.general average
C.particular average
D.total loss of a part
A.actual total loss
B.constructive total loss
C.general average
D.particular average
A.Which
B.There
C.Where
D.While
A.Bill of lading
B.Bill of exchange
C.Mate's receipt
D.Manifest
最新試題
Deviation is caused by().
Deviation to save()is always justified,unless it is expressly stipulated otherwise.
It becomes a common practice to insert a clause in the bills of lading for vessels trading to and from the United States,expressly declaring()the Shipowner could recover in general average in the event of negligence,provided that due diligence has been exercised to make the ship in all respects seaworthy.
Loss or damage caused by cutting away wreck or parts of the ship which have been previously carried away or are effectively lost by accident shall not be made()as general average.
The invariable result of()average is that the loss falls on the owner of the particular property which has suffered the damage,whether that damage was due to deliberate sacrifice or to an accident.
In case of any loss or misfortune it is the duty of()to take such measures as may be reasonable for the purpose of averting or minimizing a loss which would be recoverable under this insurance.
If the redelivery of a vessel is delayed by causes (),hire is payable at the charter rate until redelivery even though the market rate may have gone up or down.
Delivery of the goods to the buyer’s agent for the purpose of forwarding()an end to the transit if further destination has not been notified to the seller.
The mere washing overboard of part of the cargo will not()rise to a general average contribution; nor will the throwing overboard of cargo by the crew or passengers out of private malice.
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.