A.Tearing through the member is more likely in this type connection
B.The weld may be broken by the stresses caused by riveting
C.The weld increases the tensile stress on the rivet heads
D.The welding must be completed before the riveting commences
您可能感興趣的試卷
你可能感興趣的試題
A.shall
B.should
C.may
D.would
A.a marine chemist
B.the Officer in Charge,Marine Inspection
C.the Master or person in charge of the ship
D.the National Fire Protection Association
A.to be carried out
B.carry out
C.be carried out
D.will carry out
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
最新試題
The bottom of the mast rests on a part of the keel called the mast().
The document on a vessel,annually endorsed by an American Bureau of Shipping surveyor,is called the().
Chain slings are suitable for heavy slender articles,such as().
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
The conclusion is()the said ship is fit to continue to sail.
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
Cracks may be prevented from developing at the corners of welded plating inserts by().
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
The angle at which the anchor flukes penetrate the soil is the().