A.of
B.for
C.with
D.in
您可能感興趣的試卷
你可能感興趣的試題
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
最新試題
The annual survey for endorsement of a Load Line Certificate must be held within().
Chafing gear().
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
Let’s submit the case() the cargo surveyor.
Please arrange the survey()early.
Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
Tensile stress is a result of two forces acting in().
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().