A.Certificate of Inspection
B.Classification Certificate
C.Load Line Certificate
D.Seaworthy Certificate
您可能感興趣的試卷
你可能感興趣的試題
A.it
B.this
C.that
D.what
A.approves
B.alleges
C.allows
D.permits
A.foot
B.heel
C.step
D.sole
A.prevent the boom from being raised too high
B.prevent the boom from swinging
C.support the boom when not in use
D.prevent the boom from being lowered
A.the three month period immediately following the certificate's anniversary date
B.the three month period immediately preceding the certificate's anniversary date
C.three months either way of the certificate's anniversary date
D.the three month period centered on the certificate's anniversary date
最新試題
The bottom of the mast rests on a part of the keel called the mast().
Please arrange()a surveyor to inspect the damaged bulkhead.
Cracks may be prevented from developing at the corners of welded plating inserts by().
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
The conclusion is()the said ship is fit to continue to sail.
Chafing gear().
Chain slings are suitable for heavy slender articles,such as().
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
Please arrange the survey()early.
I saw the cargo surveyor()the cargo on deck just a minute ago.