A.Because
B.Owing to
C.Having been
D.Being
您可能感興趣的試卷
你可能感興趣的試題
A.A vessel engaged in laying,servicing or picking up a navigation mark,submarine cable or pipeline
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel engaged in replenishment or transferring persons,provisions or cargo while underway
D.A power driven vessel which because of her draught in relation to the available depth and width of navigation water is severely restricted in her ability to deviate from the course she is following
A.Any aircraft designed to maneuver on the water
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel under sail provided that propelling machinery is not used
D.A small vessel sailing at night
A.are
B.is
C.have
D.has
A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a diver survey report
最新試題
The boom stops are installed on an offshore crane to().
The end of the joint with the exterior threads is called the().
The angle between the flukes and the shank of an anchor is called the().
Connecting elements of a mooring system should be fabricated from().
The annual survey for endorsement of a Load Line Certificate must be held within().
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
Tensile stress is a result of two forces acting in().
The conclusion is()the said ship is fit to continue to sail.
The burden of proving unseaworthiness is upon those who()it.
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().