A.Any aircraft designed to maneuver on the water
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel under sail provided that propelling machinery is not used
D.A small vessel sailing at night
您可能感興趣的試卷
你可能感興趣的試題
A.are
B.is
C.have
D.has
A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a diver survey report
最新試題
Let’s submit the case() the cargo surveyor.
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
The boom stops are installed on an offshore crane to().
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
The conclusion is()the said ship is fit to continue to sail.
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Cracks may be prevented from developing at the corners of welded plating inserts by().
The anchors on the bow are known as().
The end of the joint with the exterior threads is called the().
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.