A.holding angle
B.fleet angle
C.fluke angle
D.shank angle
您可能感興趣的試卷
你可能感興趣的試題
A.burial angle
B.penetration angle
C.fluke angle
D.holding angle
A.bower anchors
B.kedge anchors
C.spare anchors
D.stream anchors
A.relayed
B.delayed
C.conveyed
D.surveyed
A.opposite directions on the same line,tending to pull the material apart
B.opposite directions on the same line,tending to compress the object
C.opposite directions along parallel lines
D.the same direction along parallel lines
A.Tearing through the member is more likely in this type connection
B.The weld may be broken by the stresses caused by riveting
C.The weld increases the tensile stress on the rivet heads
D.The welding must be completed before the riveting commences
最新試題
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
The conclusion is()the said ship is fit to continue to sail.
I saw the cargo surveyor()the cargo on deck just a minute ago.
Chain slings are suitable for heavy slender articles,such as().
The boom stops are installed on an offshore crane to().
At()an occasional survey has been carried out.
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
Connecting elements of a mooring system should be fabricated from().
During fueling,all doors,hatches,and ports().