單項(xiàng)選擇題

Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()

A.confused
B.same
C.overlap
D.dissever


你可能感興趣的試題

最新試題

()means that every project has a definite beginning and a definite end.

題型:單項(xiàng)選擇題

Which of the following statement related to PMO is not correct?()

題型:單項(xiàng)選擇題

Project Quality Management must address the management of the project and the() of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.

題型:單項(xiàng)選擇題

The()provides the project manager with the authority to apply organizational resources to project activities.

題型:單項(xiàng)選擇題

空白(2)處應(yīng)選擇()

題型:單項(xiàng)選擇題

()is a category assigned to products or services having the same functional use but different technical characteristics. It is not same as quality.

題型:單項(xiàng)選擇題

On some projects, especially ones of smaller scope, activity sequencing, activity resource estimating, activity duration estimating, and () are so tightly linked that they are viewed as a single process that can be performed by a person over a relatively short period of time.

題型:單項(xiàng)選擇題

Project() Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

題型:單項(xiàng)選擇題

The() defines the phases that connect the beginning of a project to its end.

題型:單項(xiàng)選擇題

The()process analyzes the effect of risk events and assigns a numerical rating to those risks.

題型:單項(xiàng)選擇題