單項(xiàng)選擇題委托方逾期()個(gè)月不支付報(bào)酬或違約金的,應(yīng)交還工作成果并支付違約金。

A.2
B.3
C.6
D.1


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題企業(yè)經(jīng)營(yíng)方案決策最終所選出的方案一般為()。

A.成本最低的方案
B.較為滿意的方案
C.各個(gè)目標(biāo)都最佳的方案
D.實(shí)現(xiàn)利潤(rùn)最大的方案

最新試題

翻譯:A porous medium has a permeability of one darcy when a single phase fluid of one centipoise viscosity that completely fills the voids of the medium, will flow through it under conditions of viscous flow at a rate of one cubic centimeter per second per square centimeter cross sectional area under a pressure or equivalent hydraulic gradient of one atmosphere per centimeter.

題型:?jiǎn)柎痤}

翻譯:There are two approaches to the problem of determining the fluid saturation within a reservoir rock. The direct approach is to measure, in the laboratory, the saturation of selected rock samples recovered from the parent formation. The indirect approach is to determine the fluid saturation by measuring some related physical property of the rock.

題型:?jiǎn)柎痤}

翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.

題型:?jiǎn)柎痤}

翻譯:Gas lift is the method of artificial lift that uses an external source of high-pressure gas for supplementing formation gas to lift the well fluids. The primary consideration in the selection of availability and compression cost of gas.

題型:?jiǎn)柎痤}

翻譯:The first step in planning a well should be the gathering of all available data on past wells. In this respect it is important to be completely familiar with all sources of information, the availability of the sources, and the information normally associated with each source.

題型:?jiǎn)柎痤}