A.成本最低的方案
B.較為滿意的方案
C.各個(gè)目標(biāo)都最佳的方案
D.實(shí)現(xiàn)利潤(rùn)最大的方案
您可能感興趣的試卷
你可能感興趣的試題
A.大于
B.小于
C.等于
A.人口
B.只均國(guó)民收入
C.國(guó)民受教育水平
D.產(chǎn)品質(zhì)量

最新試題
翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.
翻譯:The primary limitations for gas lift operations are the lack of formation gas of an outside source of gas, wide well spacing, and available space for compressors on off-shore plat forms. Generally, gas lift is not applicable to single-well installations and widely spaced wells that are not suited for a centrally located power system.
翻譯:THE OPEC oil cartel is about to turn 40, and the mood in the run-up to the grand heads-of-state party in Venezuela in less than three weeks time is jubilant. Not quite two years ago,oil was $10 a barrel and the cartel was on the brink of collapse. Now the oil price is well above $30 a barrel, and it shows little sign of coming down.
翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.
翻譯:An acidizing treatment for a sandstone formation normally will consist of sequentially injecting three fluids---a preflush, the hydrofluoric acid hydrochloric acid mixture, and an after flush. These fluids serve definite purposes.