A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a dive survey report
您可能感興趣的試卷
你可能感興趣的試題
A.order list
B.repair list
C.srore list
D.spare parts list
A.the ship type
B.the port's organization
C.the cargo's nature
D.the docker's ability
A.at
B.to
C.for
D.in
A.The fioot/tons needed to trim the vessel by 1 inch
B.The foot/tons needed to trim the vessel by 1 foot
C.The moments needed to trim the vessel by 1 centimeter
D.The amount of vessel will trim when loading 100 tons 100 feet from the tipping center
A.The amount of buoyancy measured in foot/tons
B.The vertical distance above the waterline inside the hull
C.The volune of space that is filled with water
D.The volume of intact space above the waterline
最新試題
Which of the following is not an operation mode of AIS?()
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
What is a CORRECT reply to a pilot’s request, How’s your heading?()
What is it called when it is possible to ignite the vapour above the oil?()
()is on the panel of radar.
The ISM code is part of().
The loading of the ship must be done in accordance with().
Which of the following is not a form of precipitation?()
The mean draft of a ship is the draft().
Manoeuvring information can not be obtained from().