A.order list
B.repair list
C.srore list
D.spare parts list
您可能感興趣的試卷
你可能感興趣的試題
A.the ship type
B.the port's organization
C.the cargo's nature
D.the docker's ability
A.at
B.to
C.for
D.in
A.The fioot/tons needed to trim the vessel by 1 inch
B.The foot/tons needed to trim the vessel by 1 foot
C.The moments needed to trim the vessel by 1 centimeter
D.The amount of vessel will trim when loading 100 tons 100 feet from the tipping center
A.The amount of buoyancy measured in foot/tons
B.The vertical distance above the waterline inside the hull
C.The volune of space that is filled with water
D.The volume of intact space above the waterline
A.will contain no additional moisture
B.has the lowest relative humidity
C.cannot keep up its moisture
D.has a low absolute humidity
最新試題
The helm command PORT TWENTY means().
The circulation around a low pressure center in the Northern Hemisphere is().
Full details of all lights and fog signals are shown on().
What is a CORRECT reply to a pilot’s request, How’s your heading?()
Berthing means bringing a vessel to her berth until().
A tide is called diurnal when().
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
The loading of the ship must be done in accordance with().
The ISM code is part of().
Which of the following is not a form of precipitation?()