A.the ship type
B.the port's organization
C.the cargo's nature
D.the docker's ability
您可能感興趣的試卷
你可能感興趣的試題
A.at
B.to
C.for
D.in
A.The fioot/tons needed to trim the vessel by 1 inch
B.The foot/tons needed to trim the vessel by 1 foot
C.The moments needed to trim the vessel by 1 centimeter
D.The amount of vessel will trim when loading 100 tons 100 feet from the tipping center
A.The amount of buoyancy measured in foot/tons
B.The vertical distance above the waterline inside the hull
C.The volune of space that is filled with water
D.The volume of intact space above the waterline
A.will contain no additional moisture
B.has the lowest relative humidity
C.cannot keep up its moisture
D.has a low absolute humidity
A.The metacenter will move downward
B.The GM will increase
C.The center of buoyancy will move upward
D.The list of the vesel will become great
最新試題
The helm command PORT TWENTY means().
According to the relevant regulation, lifeboat should be powered by().
Which wind results from a land mass cooling more quickly at night than an adjacent water area?()
The loading of the ship must be done in accordance with().
Which of the following shall not the officers in charge of the navigational watch do?()
Before any loading takes place any signs of the previous cargo should do().
Full details of all lights and fog signals are shown on().
Manoeuvring information can not be obtained from().
What is it called when it is possible to ignite the vapour above the oil?()
A tide is called diurnal when().