A.keep the liferaft from capsizing
B.navigate against the current
C.keep personnel from getting seasick
D.stay in the general location
您可能感興趣的試卷
你可能感興趣的試題
A.on the station bill
B.on a sign next to the liferaft
C.on the Certificate of Inspection
D.in the Operations Manual
A.Proof tested
B.End-for-ended
C.Renewed
D.Weight tested
A.End-for-ended
B.Renewed
C.Inspected
D.Weight tested
A.grooved wheel in a block
B.line to hold a lifeboat next to the embarkation deck
C.partial load of grain
D.seaman's knife
A.a heavy anchor with an extra long line used to anchor in deep water
B.a cone shaped bag used to slow down the wind drift effect
C.a padeye to which the sea painter is made fast
D.made of wood if it is of an approved type
最新試題
According to the ship regulations,the capacity of a liferaft is required to be marked().
How many life buoys have your ship been exactly().
Fire fighting equipment requirements for a particular vessel may be found on the().
After abandoning ship,you should deploy the sea anchor from a liferaft to().
The connection facilities for the international shore connection must be located to provide access().
On a ship,how many ring buoys are required to have a buoyant line attached?()
During the required periodic abandon ship drill aboard a ship,each person not assigned duties in the muster list is().
On a small boat,which knot is best suited for attaching a line to the ring of an anchor?()
On cargo and miscellaneous vessels what is NOT a required part of the fireman’s outfit?()
On a ship,a fixed carbon dioxide or other approved system must be installed().