A.produced by
B.met with
C.offered of
D.provided with
您可能感興趣的試卷
你可能感興趣的試題
A.there exist
B.there is
C.there are
D.are there
A.reduce the swinging of the lifeboat as it is being lowered from the embarkation level
B.secure the lifeboat in the davits when in the stowed position
C.hold the lifeboat to the ship's side until the tricing lines are passed
D.be used as a safety line in an emergency
A.Certificate of Inspection
B.Certificate of Seaworthiness
C.Classification Certificate
D.Certificate of Registry
A.hand-propelling gear
B.a davit span with at least 2 lifelines
C.a mast and a sail
D.a motor
A.2 months
B.3 months
C.4 months
D.5 months
最新試題
After abandoning ship,you should deploy the sea anchor from a liferaft to().
The connection facilities for the international shore connection must be located to provide access().
On a ship,watertight doors should be operated().
Each open lifeboat carried on a vessel on an international voyage must have().
In launching a covered lifeboat,what would safely lower the lifeboat from inside the lifeboat cabin?()
On a class B fire,which portable fire extinguisher would be the LEAST desirable?()
During a fire drill on a ship,what action is required?()
How should the lifeboat sea painter be rigged?()
Frapping lines are fitted to lifeboat davits to().
The Master or person in charge of a ship shall insure that each deck from which lifeboats are launched is().