A.The 2004 Jubilee
B.The 2006 Jubilee Edition
C.Marine Stores Guide 2007
D.Marine Stores Guide 2008
您可能感興趣的試卷
你可能感興趣的試題
A.week
B.month
C.three months
D.six months
A.Increase the thrust of the propeller
B.Protect the propeller from striking sawyers
C.Prevent the propeller from striking barges towed on the ship
D.Prevent the propeller from touching bottom in low water
A.cease
B.stop
C.suspend
D.delete
A.Vendor
B.Purchaser
C.Master
D.Shipper
A.With switches
B.With a governor on the engine
C.With fuses or circuit breakers
D.By using heavy wire
最新試題
Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()
A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().
On a ship,each emergency generator must be tested at least once each().
() is true.
The latest edition of ISSA Ship Stores Catalogue is().
If the Vendor is unable to make delivery,or to make delivery in good time,owing to force majeure then the Vendor’s obligation to deliver shall().
To find the cause of a gasoline engine’s failure to start,you should().
A tackle by which the outer end of a boom is raised and lowered is the topping().
A single heavy wire made up for the topping lift is called a().
Kort nozzles are installed around the propellers of some vessels to().