A.Boom
B.Lift
C.Raise
D.Tackle
您可能感興趣的試卷
你可能感興趣的試題
A.A short length of line used for temporarily holding another line
B.A snatch block for handling a topping lift
C.An engine order telegraph
D.The brake on a cargo winch
A.Standing rigging
B.A downhaul
C.A halyard
D.A jib
A.Short splice
B.Long splice
C.Back splice
D.Spindle splice
A.snatch block
B.threefold purchase
C.handy-billy
D.chockablock
A.Bale
B.Spanner wire
C.Bull line
D.Working guy
最新試題
You are passing the Bayou Sara gage which reads 3.9 feet. Which of the following statements is TRUE?()
Your fireman’s outfit includes a(n)().
Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()
A single heavy wire made up for the topping lift is called a().
Your vessel is equipped with a fixed CO2 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?()
You are ordering ship’s stores. Which statement is TRUE?()
Your vessel has just finished bunkering and has a small list due to improper distribution of the fuel oil. This list will cause().
The three conditions which cause engine shutdown are overspeed,low lube oil pressure,and().
Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()
The Purchaser shall(),prior to the ship’s departure,the invoiced amount at the rate of exchange applicable on the day of payment.