A.load panel
B.emergency generator control panel
C.battery changing and discharging panel
D.paralleling panel
您可能感興趣的試卷
你可能感興趣的試題
A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
最新試題
() is not installed on the main switchboar.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The condensers located in various stages of a flash evaporator are cooled by()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The shipboard oil pollution emergency plan will be invalid after ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The main purpose of port State control is not to()
Diesel engine air start system check valves are opened by ()