A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
您可能感興趣的試卷
你可能感興趣的試題
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower
A.be switched off by the duty officer
B.be switched on by the duty officer
C.be switched off automatically
D.be switched on automatically
最新試題
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Using a file without a handle may result in ()
If separating effect is not good, which measure should be taken ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
() is not installed on the main switchboar.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The cetane rating of diesel fuel is an indication of the ()
The ISPS Code consists of a mandatory section-Part A, which shows()