A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
您可能感興趣的試卷
你可能感興趣的試題
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower
最新試題
Diesel engine air start system check valves are opened by ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
() is not installed on the main switchboar.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The ISPS Code consists of a mandatory section-Part A, which shows()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The cetane rating of diesel fuel is an indication of the ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.