A.winch
B.windlass
C.draw works
D.dynamic pay out system
您可能感興趣的試卷
你可能感興趣的試題
A.flex joint
B.slip joint
C.heave joint
D.riser joint
A.stringers
B.girders
C.breasthooks
D.deck beams
A.in
B.on
C.out
D.with
A.cargo handling machines
B.deck winches and derricks
C.engine-room tools
D.course controlling system
A.the galvanizing on steel
B.a hatch cover
C.the outer plating of a vessel
D.synonymous with decking
最新試題
The machinery associated with heaving in and running out anchor chain is the().
Owing to the greater girth of a ship amidships than at the ends,certain strakes are dropped as they approach the bow and stern to reduce the amount of plating at the ends. These strakes are called().
Ship’s steering gear refers to().
Forecastle deck is located in the ship’s().
Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().
The term strake is used in reference to().
Freeboard is measured from the upper edge of the().
To determine the weight capacity of a deck in a cargo hold,you would refer to the().
Holes in the bulwark,which allow deck water to drain into the sea,are().
Prior to magnetic particle inspection of anchor chain,the chain should be().