A.no operation procedures for the oil separators
B.engine log book missing
C.the master and the chief engineer are unable to communicate effectively
D.absence of an up-date muster list
您可能感興趣的試卷
你可能感興趣的試題
A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book
A.absence of engine log book
B.serious corrosion on the hull
C.one page missing in the oil record book
D.paint peeling off some tailings in engine rooms
A.paint peeling off the uptake
B.no operation procedures for the oil separators
C.one of ship’s certificates required is invalid
D.damaged sanitary pump
A.IOPP
B.type approval certificate
C.cargo ship safety equipment certificate
D.cargo ship safety certificate
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Diesel engine air start system check valves are opened by ()
The cetane rating of diesel fuel is an indication of the ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Using a file without a handle may result in ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()