A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book
您可能感興趣的試卷
你可能感興趣的試題
A.absence of engine log book
B.serious corrosion on the hull
C.one page missing in the oil record book
D.paint peeling off some tailings in engine rooms
A.paint peeling off the uptake
B.no operation procedures for the oil separators
C.one of ship’s certificates required is invalid
D.damaged sanitary pump
A.IOPP
B.type approval certificate
C.cargo ship safety equipment certificate
D.cargo ship safety certificate
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
最新試題
Under MARPOL Code the ship to which it applies has to carry ()
The treatment of the fuel oils involves storage, heating, filtering and()
Diesel engine air start system check valves are opened by ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()