A.paint peeling off the uptake
B.no operation procedures for the oil separators
C.one of ship’s certificates required is invalid
D.damaged sanitary pump
您可能感興趣的試卷
你可能感興趣的試題
A.IOPP
B.type approval certificate
C.cargo ship safety equipment certificate
D.cargo ship safety certificate
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.ships of above 200 GT to MARPOL
B.every ship of 400 GT and above
C.all ships
D.ships of more than 200 GT but less 400 GT
A.one year
B.two years
C.four years
D.five years
A.one year
B.two years
C.four years
D.five years
最新試題
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
If separating effect is not good, which measure should be taken ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the following items don’t belong to dock repair works?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()