A.Haul away
B.Tail block is made fast
C.Negative
D.Affirmative
您可能感興趣的試卷
你可能感興趣的試題
A.in warehouses
B.on deck
C.ashore
D.in the tallyroom
A.frequent opening of hatches to permit entry of fresh air
B.regular checks of bilge levels
C.use of ear plugs to dampen engine noise
D.frequent flushing of the water spray system with fresh water
A.one white light
B.two vertical white lights
C.one yellow light
D.two vertical yellow lights
A.runs from a low supporting level up to the cargo at an angle
B.is also known as a distance piece
C.is placed on the deck under the cargo to distribute its weight evenly
D.is run horizontally from a support to the cargo
A.only when the cargo is within its rail
B.after the cargo is checked by tallymen
C.as soon as the cargo loading or unloading begins
D.during the time when loading or unloading is going on
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
When general cargo with different amounts in each draft is involved,the checker must use the ().
The foreman says that the stevedores stopped working owing to the()of the winch.
The ship will be responsible for the cargo loaded or unloaded().
We’ll adopt the mechanical tallying method().
The inability to supply a cargo of the contractual quantity in the country of shipment()the doctrine of frustration into operation.
You are transporting dangerous cargo on your vessel.You must inspect this cargo().
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().
()is not an advice be observed when samples are taken in tanks containing volatile petroleum products.
The Captain of the Port has closed to navigation,and buoyed,a section of a harbor. These buoys would be painted().
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().