A.to
B.of
C.for
D.about
您可能感興趣的試卷
你可能感興趣的試題
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
最新試題
At()an occasional survey has been carried out.
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
The anchors on the bow are known as().
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
Connecting elements of a mooring system should be fabricated from().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
The annual survey for endorsement of a Load Line Certificate must be held within().
Chafing gear().
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().