單項(xiàng)選擇題計(jì)算機(jī)中,下列四個(gè)不同數(shù)制表示的數(shù)中,數(shù)值最大的是()。

A.二進(jìn)制數(shù)11011101
B.八進(jìn)制數(shù)334
C.十進(jìn)制數(shù)219
D.十六進(jìn)制數(shù)DA


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題在計(jì)算機(jī)操作系統(tǒng)中,存儲(chǔ)管理主要是對(duì)()。

A.外存的管理
B.內(nèi)存的管理
C.輔助存儲(chǔ)器的管理
D.內(nèi)存和外存的統(tǒng)一管理

最新試題

翻譯:The fluids of a petroleum reservoir are generally gas, oil, and water in varying proportions. Each phase can differ widely in composition and properties. Gas and oil, either as separate fluids or in mixtures, change their state or phase as reservoir pressure changes.

題型:?jiǎn)柎痤}

翻譯:The transportation of oil has also led to the spectacular development of gait ships ,the largest ships that ever sailed the oceans of the world .in the last few years ,since it has been necessary to ship oil from middle East-one of the largest oil producing regions-around the cap of Good Hope in south Africa these tanks has grown to almost unblievable proportions.

題型:?jiǎn)柎痤}

翻譯:The primary limitations for gas lift operations are the lack of formation gas of an outside source of gas, wide well spacing, and available space for compressors on off-shore plat forms. Generally, gas lift is not applicable to single-well installations and widely spaced wells that are not suited for a centrally located power system.

題型:?jiǎn)柎痤}

翻譯:In addition to being useful as an exploration tool, subsurface maps are a necessary part of any reservoir engineering study; and petroleum engineers, as well as geologists, must be completely familiar with their construction and interpretation.

題型:?jiǎn)柎痤}

翻譯:Land maps are essential in establishing control wells and provide fundamental orientation. As Fig.2 illustrates, land maps which are readily available within most companies as well as readily available commercially, provide offset operators, total depth, formation tops and development dates. The land map is essential in establishing orientation and control.

題型:?jiǎn)柎痤}