A.產(chǎn)值
B.產(chǎn)品質(zhì)量
C.確定生產(chǎn)指標
D.規(guī)定車間的生產(chǎn)任務(wù)
您可能感興趣的試卷
你可能感興趣的試題
A.文件名
B.發(fā)文字號
C.文件編號
D.間隔線
A.貢獻考評
B.能力考評
C.技能考評
D.潛力考評
A.生理需要
B.社會需要
C.安全需要
D.尊重需要
A.民意測驗
B.自我填表
C.上級填表
A.技術(shù)狀況
B.進行情況
C.工作性能
D.磨損程度
![](https://static.ppkao.com/ppmg/img/appqrcode.png)
最新試題
翻譯:The primary limitations for gas lift operations are the lack of formation gas of an outside source of gas, wide well spacing, and available space for compressors on off-shore plat forms. Generally, gas lift is not applicable to single-well installations and widely spaced wells that are not suited for a centrally located power system.
翻譯:In the chapter and the next some aspects of rod pumping and of the instruments used to analyze pumping well behavior are discussed. Many different pumping systems are in current use , e.g. , conventional sucker rod pumping, long-stroke pumping , hydraulic ,centrifugal,and sonic pumping ,but no attempt is made to deal here with any other method than convention a sucker rod pumping.
翻譯:For example ,the determination of the pump-setting depth and size of plunger that will lead to the maximum pumping rate in a particular well is a problem of considerable difficulty, which even today has not been fully or saris factorial solved; another interesting problem is that of gas anchors(bottom-hole separators); yet another is the interpretation of the results obtained form devices for determining the depth of the fluid level in the annulus during pumping.
翻譯:Meanahile ,steel pipes that would carry the oil were being developed . These were the first oil pipelines which take the advantage of the fact the oil is a liqnid. The ideas of a pipeline were not new , water has been transported through pipes for handreds of year ,The oil pipeline were not accepted without a struggle, hower.
翻譯:After the casing string is run, the next task is cementing the casing in place. An oil well cementing service company is usually called in for this job although, as when casing is run,the rig crew is available to lend assistance.
翻譯:There are two approaches to the problem of determining the fluid saturation within a reservoir rock. The direct approach is to measure, in the laboratory, the saturation of selected rock samples recovered from the parent formation. The indirect approach is to determine the fluid saturation by measuring some related physical property of the rock.
翻譯:Since the volume factors and the solution gas-oil ratio are determined from laboratory measurements on samples of reservoir fluid at reservoir temperature and various pressures, these parameters are effective substitutes for detailed phase equilibrium data in most production calculations. However, these parameters are unknown at the time that exploration well tests are run, and hence they are estimated from correlation charts.
翻譯:The HF-HCI mixture (usually 3-percent HF and 12-percent HCI) then is injected. The HF reacts with calys, sand, drilling mud, or cement filtrate to improve permeability near the well-bore.The HCI will not react and is present to keep the PH low, preventing precipitation of HF reaction products. Sent to keep the PH low, preventing precipitation of HF reaction products.
翻譯:A paraffin base crude is an oil whose chief components are paraffins, and which completely distilled, leaves a solid residue of wax. An asphalt base crude is an oil composed primarily of cyclic compounds (mostly naphthenes) which, when distilled, leaves a solid residue of asphalt. Oils which fall in the middle of these categrories are classified as mixed base.
翻譯:Land maps are essential in establishing control wells and provide fundamental orientation. As Fig.2 illustrates, land maps which are readily available within most companies as well as readily available commercially, provide offset operators, total depth, formation tops and development dates. The land map is essential in establishing orientation and control.