A.the floating-free method only
B.breaking the weak link on the painter
C.throwing the entire container overboard and then pulling an the operating
D.removing the securing straps
您可能感興趣的試卷
你可能感興趣的試題
A.pulling a cord
B.cutting the wire restraining bands
C.removing the rudder packing strip
D.throwing the entire container overboard
A.The sea anchor deploys
B.The floor inflates
C.If upside down, the craft rights itself
D.The painter detaches from the raft
A.the single hook at the top of the raft
B.two lines passed under the raft
C.the towing bridle
D.All of the above
A.cutting the straps that enclose the container
B.removing the rubber sealing strip from the container
C.loosening the turnbuckle on the securing strap
D.pushing the button on the hydrostatic release
A.only when the load is taken off the cable
B.only when there is a load on the cable
C.only when activated by the controls at the lowering station
D.at any time
最新試題
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
In the Northern hemisphere northerly winds may cause temperature().
According to the relevant regulation, lifeboat should be powered by().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
Before any loading takes place any signs of the previous cargo should do().
When steering by autopilot,how often should the steering be checked?()
The dew point temperature is().
Bales close to the deckhead should be covered to prevent().
The company should establish and maintain procedures to control all documents and date which are relevant to().
The ISM code is part of().