A.pulling a cord
B.cutting the wire restraining bands
C.removing the rudder packing strip
D.throwing the entire container overboard
您可能感興趣的試卷
你可能感興趣的試題
A.The sea anchor deploys
B.The floor inflates
C.If upside down, the craft rights itself
D.The painter detaches from the raft
A.the single hook at the top of the raft
B.two lines passed under the raft
C.the towing bridle
D.All of the above
A.cutting the straps that enclose the container
B.removing the rubber sealing strip from the container
C.loosening the turnbuckle on the securing strap
D.pushing the button on the hydrostatic release
A.only when the load is taken off the cable
B.only when there is a load on the cable
C.only when activated by the controls at the lowering station
D.at any time
A.sufficient oxygen in a compartment to support life
B.combustible gases present
C.hydrogen gases present
D.All of the above
最新試題
In the Northern hemisphere northerly winds may cause temperature().
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
According to the relevant regulation, lifeboat should be powered by().
Berthing means bringing a vessel to her berth until().
The company should establish and maintain procedures to control all documents and date which are relevant to().
ECDIS must be able to perform all of the following EXCEPT().
The dew point temperature is().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Before any loading takes place any signs of the previous cargo should do().
Manoeuvring information can not be obtained from().