A.if he can do so without any risk to his vessel
B.if he can do so without undue delay
C.if he can do so without serious danger to his vessel or to individuals on board
D.without regard to any danger to his vessel
您可能感興趣的試卷
你可能感興趣的試題
A.static grounding device
B.quick-disconnect nozzle
C.splash guard
D.vapor recovery system
A.all mooring lines have a different tension
B.the leeward lines have higher tension than the windward lines
C.the maximum tension of the most heavily loaded line does not exceed the safe working load
D.all horizontal tension forces on the windward lines are no greater than the vertical tension forces
A.deballasting the rig
B.ballasting the rig
C.paying out cable on the windward side
D.paying out cable on the leeward side
A.be assisted in walking around
B.be examined then walked to a bunk
C.not be moved but made comfortable until medical assistance arrives
D.not be allowed to lie down where injured but moved to a chair or bunk
A.salvage operation
B.cargo discharging
C.bunkering
D.towing operation
最新試題
The hinge fitting used to attach the boom to the mast is the().
In order to pay out or slack a mooring line which is under strain,you should().
The heaviest type pallet is the().
In heavy seas the helmsman should steer the survival craft().
When evacuating a seaman by helicopter lift,which statement is TRUE?()
The holding power of an anchor is the().
Some sea water came into the wheel house during the voyage due to()the window thereof.
The major components which determine the length of a catenary in a deployed anchor cable are water depth,cable weight,and().
If your vessel is dragging her anchor in a strong wind,you should().
It’s not advisable to cut()the power supply.