A.static grounding device
B.quick-disconnect nozzle
C.splash guard
D.vapor recovery system
您可能感興趣的試卷
你可能感興趣的試題
A.all mooring lines have a different tension
B.the leeward lines have higher tension than the windward lines
C.the maximum tension of the most heavily loaded line does not exceed the safe working load
D.all horizontal tension forces on the windward lines are no greater than the vertical tension forces
A.deballasting the rig
B.ballasting the rig
C.paying out cable on the windward side
D.paying out cable on the leeward side
A.be assisted in walking around
B.be examined then walked to a bunk
C.not be moved but made comfortable until medical assistance arrives
D.not be allowed to lie down where injured but moved to a chair or bunk
A.salvage operation
B.cargo discharging
C.bunkering
D.towing operation
最新試題
If your vessel is dragging her anchor in a strong wind,you should().
The hoist line primarily used for lifting personnel on ship cranes is called the().
In determining the scope of anchor line to pay out when anchoring a small boat,one must consider the().
When evacuating a seaman by helicopter lift,which statement is TRUE?()
Production of mechanical foam by a portable in-line foam proportioner().
LIFTING THE ANCHOR FROM THE BOTTOM is called().
What is the lifesaving signal for You are seen -assistance will be given as soon as possible?()
It was demanded that the injured crewmembers()at once.
It is good practice to use long towlines for ocean tows because the().
When a rescuer finds an electrical burn victim in the vicinity of live electrical equipment or wiring,his first step is to().