A.the engineers,from a panel in the engine room
B.shutting off the current to the winch
C.pushing the switch lever arm while the winch is running
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.increasing the shaft RPM prior to release
B.using a pelican hook for quick release
C.using preventers
D.using a short chain for the lead through the stern chock
A.5 times the depth of the water in good holding ground
B.10 times the depth of the water in shallow water
C.2 times the depth of the water in poor holding ground
D.8 times the depth of the water in deep water
A.coil it counterclockwise
B.not coil it
C.take a turn under
D.twist out the kinks under a strain
A.when the line pull reaches the rated winch capacity
B.after the line pull exceeds the rated winch capacity
C.after a short build-up of torque
D.immediately
A.anchoring
B.mooring
C.sewing
D.splicing
最新試題
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().
The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward. This is the signal to().
Chafing gear is normally used().
Herringbone is a term associated with().
Limit switches on gravity davits should be tested by().
A splice that can be used in running rigging,where the line will pass through blocks,is a().
The only wire rope termination which may be made in the field is().
The main function of the core of a wire rope is to().
The rope which is rove from the truck to be used with a bos’n chair is called a().
A tackle by which the outer end of a boom is raised and lowered is the topping().