A.half the breaking strength of the mooring line
B.the full breaking strength of the mooring line
C.the maximum expected tension of the mooring line
D.50% over the working tension of the mooring line
您可能感興趣的試卷
你可能感興趣的試題
A.removed from the anchor chain
B.connected to a buoy at the anchor
C.stripped back to the rig and secured
D.connected to a buoy halfway down the chain
A.keeps the ends from fraying
B.strengthens it
C.protects your hands
D.becomes part of a splice
A.a messenger
B.a stopper for nylon line
C.a U-bolt for securing a cargo whip to the winch drum
D.turns of twine around a rope end
A.boom
B.lift
C.raise
D.tackle
A.riding pawl
B.buckler
C.devil's claw
D.locking ring
最新試題
Neglecting friction,you desire to lift a 300 kgs weight with a stress on the hauling part of 100 kgs.Which of the following tackles would you use?().
Galvanizing would be suitable for protecting wire rope which is used for().
The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward. This is the signal to().
An anchor winch should be equipped with mechanical brakes capable of holding().
A whipping on a fiber line().
The size of wire rope is determined by the().
A stopper used in securing the ground tackle for sea that consists of a grab attached to a turnbuckle is a().
Chafing gear is used to().
The standing part of a tackle is().
Chafing gear is normally used().