A.deck edge immersion
B.the load line
C.downflooding
D.loll
您可能感興趣的試卷
你可能感興趣的試題
A.on
B.in
C.at
D.into
A.Deck area
B.Dining room on board
C.Assembly station
D.Hold
A.adjusting the hose supports
B.laying out an excess length of hose on deck
C.tying off the topping lifts and runners to winch heads
D.All of the above
A.at its goose neck to such a extent
B.at it's goose neck to such an extent
C.at it's goose neck for such a extent
D.at its goose neck to such an extent
A.height
B.breadth
C.depth
D.length
最新試題
Which will cause a wire rope to fail().
You are operating a lift boat.When beginning to jack down you should().
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
What()to him is whether the job of a deck officer allows him to pursue his studies.
Which tackle arrangement has the LEAST mechanical advantage().
What term indicates the line drawn at the top of the flat plate keel().
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The stevedores have already stowed the porcelain ware()up to the deckhead.
The main advantage and chief characteristic of a Steulchen boom is that it can be().
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().