A.Normal boom stowage and shutdown operations
B.Emergency shutdown operation
C.Removing booms from stowage
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.On the Certificate of Inspection
B.On the Muster List ("Station Bill")
C.In the Operations Manual
D.In either the official or unofficial log
A.Immediately after floating free
B.After about one hour when the salt water activates the battery
C.Only when keyed by the radar of another vessel
D.Only when daylight activates the photovoltaic cell
A.Immediately
B.After one hour
C.Only when another vessel is in sight
D.Only after sunset
A.on bottom with the full drill string in tension
B.one stand (approximately 93 feet) off bottom
C.no deeper than the shoe of the last casing set
D.as close to the surface as possible
A.one month before the anniversary date of the plan
B.six months before the end of the approval period
C.and cannot be implemented without approval
D.and can be implemented without immediate approval as long as final approval is received within six months of submission
最新試題
Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()
What would NOT be a distress signal?()
Which emergency equipment should you keep near the towing bitts? ()
Which action(s) is/are included in crane operations?()
Which channel and mode should be used when initiating a distress alert transmission?()
Which shipboard equipment will detect a signal from a SART?()
Which step should normally be taken FIRST by those who have boarded a liferaft in an emergency?()
Which of the following steps should normally be taken first by those who have boarded a liferaft in an emergency situation?()
Which equipment is not a source of locating signals?()
Which is NOT a mandatory part of the shipboard Oil Pollution Emergency Plan?()