A.Survey Report File
B.Minimum Safe Manning document
C.Certificates of Competency
D.International Oil Pollution Prevention
您可能感興趣的試卷
你可能感興趣的試題
A.through bolts
B.end chock bolts
C.side chock bolts
D.tap-bolts
A.Routine docking repair
B.Voyage repair
C.Damage repair
D.Conversion
A.Because it is difficult to plan and manage
B.Because it is cannot be well categorized
C.Because it is a difficult work for people to undergo
D.Because it is seldom researched by research
A.inform the chief engineer whenever there are problems
B.reduce the time wasted on checking items
C.know who is responsible for the domestic cleaning equipment
D.know the chain of authority on the ship
A.send a requisition list to the supplier
B.check that whether the items ordered have been already delivered
C.make the chief engineer on sport
D.follow a preset procedure
最新試題
If separating effect is not good, which measure should be taken ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The shipboard oil pollution emergency plan will be invalid after ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
() is not installed on the main switchboar.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()